# **Working Principle of Rotary Drilling Rig: Complete Process from Drilling to Hole Formation**

Views: 0     Author: Site Editor     Publish Time: 2026-11-09      Origin: Site

Inquire

facebook sharing button
twitter sharing button
line sharing button
wechat sharing button
linkedin sharing button
pinterest sharing button
whatsapp sharing button
kakao sharing button
snapchat sharing button
telegram sharing button
sharethis sharing button

After the rotary drilling rig arrives on site, it moves to the pile position via the crawler chassis. The machine is leveled and outriggers are extended to stabilize the whole unit and avoid tilting during operation. The operator adjusts the drill mast angle through the luffing mechanism to align the center of the drill bucket precisely with the preset pile center. This step lays the foundation for hole quality, and alignment accuracy directly affects the verticality of the subsequent pile foundation, serving as the primary control point for pile construction on site.

Rock-soil Cutting by Bucket and Lifting for Discharge

Once aligned, the drill pipe is lowered to let the drill bucket touch the stratum. The bucket teeth cut rock and soil driven by torque from the power head. As the drill bucket rotates, soil is loaded into the bucket, and the bottom gate closes to contain the muck. When the bucket is full, the power head stops rotating. The main winch lifts the drill pipe and brings the bucket out of the hole. The rig slews to the dumping area, the bucket gate opens for muck discharge, then the rig slews back and lowers the bucket to resume drilling. The cycle repeats to deepen the hole gradually.

Slurry Wall Protection and Hole Stability Control

Slurry wall protection is adopted for sandy soil, silt and water-rich strata. Slurry forms a filter cake on the hole wall to balance hydrostatic pressure and prevent collapse. Operators monitor slurry parameters continuously and adjust slurry density and viscosity according to stratum changes. Cooperating with rotary excavation, slurry makes up for the weakness of rotary rigs in collapse-prone strata, keeping the hole wall intact and avoiding common defects such as hole collapse and necking.

Final Hole Inspection and Verification of Depth & Diameter

Drilling stops once the designed pile depth is reached, and final hole acceptance starts. Workers use sounding lines and hole gauges to check actual hole depth, diameter and verticality. The hole is accepted only when all indicators meet drawing and specification requirements. If insufficient diameter or excessive sediment at the hole bottom is found, the drill bucket will be lowered again for bottom cleaning.

Hole Completion and Handover to Subsequent Pile Works

Qualified inspection marks the completion of hole forming. The finished borehole is ready for reinforcement cage lowering and concrete pouring to form the pile foundation. With cyclic cutting and bucket discharging, rotary drilling features faster penetration and lower noise than traditional percussion drills. It is widely used in pile projects for buildings, bridges and municipal works.

Anhui Yingxie Foundation Engineering Co., Ltd. is a leading exporter of construction machinery in China.

QUICK LINKS

PRODUCT CATEGORY

Leave a Message
CONTACT US
Copyright  2024 Anhui Yingxie Foundation Engineering Co., Ltd. All Rights Reserved. | Sitemap | Privacy Policy