A crane’s load-bearing frame consists of metal main beams, outriggers, slewing mechanisms and winch systems, which realize load bearing through mechanical balance. Steel structural members withstand tensile force and bending moment, while extended outriggers spread the machine weight on the ground to prevent tipping. The winch assembly, paired with wire ropes and pulley blocks, uses pulley ratios to reduce pulling force and lift heavy loads with limited driving power. It serves as the core unit for vertical load lifting and lays the groundwork for subsequent transfer.
At the lifting stage, slings and lifting attachments are securely fastened to the load. Operators verify the load weight to ensure it stays within the rated lifting capacity. The winch retracts and releases wire ropes to lift the hook slowly and raise the load off the ground. Operators monitor the load attitude and make timely adjustments to avoid swinging or collision with surrounding facilities. Stable hook control at proper speed is critical here. Safe load pickup marks the starting point of the whole operation.
Once the lifted load stabilizes off the ground, the slewing mechanism rotates the upper structure circumferentially. Meanwhile, the luffing mechanism adjusts the boom elevation angle to change the working radius. Coordinated movement of these two systems moves the load above the target placement area. Operators control slewing and luffing speed to mitigate swinging risks caused by inertia and bring the load precisely over the destination.
When the load aligns with the preset position, the winch lowers the hook at a controlled slow speed until the load rests steadily on the ground. After confirming stable placement and removing load stress from lifting gear, slings and attachments are detached, and the empty hook is retracted. One full lifting and handling cycle is completed. Operators may proceed to the next transfer task according to construction requirements.
The entire workflow is bounded by rated load, working radius and ground bearing capacity. At piling sites, yards, ports and other worksites, operators follow instructions from signal personnel and continuously monitor wind and ground conditions. Safety devices such as moment limiters provide risk alerts. Proper application of working principles and standardized process control enable reliable crane operation for infrastructure and heavy-lift projects.