As an important piece of equipment in construction, the rotary drilling rig's preparatory work before operation is directly related to the construction efficiency and safety. Next, we will introduce to you the preparations that need to be made before the operation of a rotary drilling rig from six key aspects.
1.Site investigation: Conduct a comprehensive inspection of the construction site to confirm the geological conditions, underground pipelines and the distribution of obstacles. Ensure that the site is flat and solid, and its load-bearing capacity meets the requirements of the drilling rig to avoid collapse during construction.
2. Equipment inspection: Conduct a detailed inspection of the engine, hydraulic system, transmission components, etc. of the rotary drilling rig. Check the levels of engine oil, hydraulic oil and other fluids to ensure that all components of the equipment are operating normally without oil leakage, abnormal noise or other faults.
3. Tool and material preparation: Prepare construction tools such as drill bits and drill pipes, and check their wear and tear. At the same time, stock up on sufficient lubricating oil, coolant and other consumables, as well as necessary maintenance tools to ensure the smooth progress of the construction.
4. Positioning and layout: Based on the construction drawings, accurately determine the pile positions using measuring instruments and make proper marks. Repeatedly check the pile position coordinates to ensure the construction position is accurate and error-free.
5. Personnel allocation and training: Arrange for professional operators, technicians and support staff to be on duty. Before construction, technical briefings and safety training should be provided to relevant personnel to clarify operation norms and precautions.
6. Procedures and Coordination: Complete all the necessary procedures for the construction and communicate and coordinate with relevant departments and units. Ensure the normal supply of water and electricity during the construction process to avoid the construction progress being affected by external factors.
Conclusion: The preparatory work before the operation of rotary drilling RIGS is the basis for ensuring the safe and efficient progress of construction. From the venue to the equipment, from the personnel to the procedures, every link cannot be ignored. Only by making full preparations can the maximum efficiency of the rotary drilling rig be brought into play and the construction tasks be successfully completed.