As the core equipment in foundation engineering, the construction efficiency of rotary drilling RIGS is directly related to the project progress and cost control. However, in actual operation, multiple factors will work together, causing the equipment to fail to perform at its best. Understanding these influencing factors is a key prerequisite for improving construction efficiency.
1. Geological conditions: Different geological conditions have a significant impact on construction efficiency. For instance, in soft soil areas, the drilling speed is fast, but in rock strata and pebble layers, the drilling rig needs to repeatedly break the rock and soil, which will greatly reduce the efficiency. If the groundwater level is too high, dewatering treatment should be carried out first to further extend the operation time.
2. Equipment performance and status: The performance of the drilling rig itself is the foundation. Equipment with high power and high stability is more suitable for complex working conditions. If the daily maintenance of the equipment is not in place, problems such as drill pipe wear and hydraulic system failure will occur, leading to frequent shutdowns for maintenance and directly slowing down the construction pace.
3. Drill tool selection: The drill tools must be compatible with the geological conditions. For instance, spiral drill buckets are highly efficient for soil layer operations, while cone drill bits should be chosen for rock layers. If the drill tool model is inappropriate or there is wear on the cutting edge, it will not only reduce the drilling speed but also may lead to safety hazards such as the collapse of the hole wall.
4. Operator skills: The experience and skills of operators are of vital importance. Skilled personnel can adjust drilling parameters in a timely manner according to geological changes, reducing ineffective operations. If the operation is not standardized, such as too fast drilling speed or improper control of drilling pressure, it is easy to cause equipment failure or accidents inside the hole.
5. Construction organization and arrangement: A reasonable construction plan affects the overall efficiency, such as whether the connection between material transportation, steel cage production and drilling rig drilling is smooth; If the coordination among various links is disconnected, and situations such as waiting for materials or failure to clear the site in a timely manner occur, it will result in idle equipment.
6. External environmental factors: Severe weather conditions can directly affect construction. For instance, heavy rain may cause water accumulation on the site and loose soil, requiring the suspension of work. In addition, the spatial layout of the construction site and the surrounding traffic restrictions will also affect the efficiency of equipment movement and the entry of auxiliary equipment.
In conclusion, the construction efficiency of rotary drilling RIGS is the result of the combined effect of multiple factors such as geology, equipment, personnel, and management. In actual engineering, it is necessary to conduct geological surveys in advance, carry out equipment maintenance well, optimize personnel allocation and construction planning, and at the same time respond well to changes in the external environment. Only in this way can the performance of equipment be maximized and the efficient progress of construction be guaranteed.