What Common Accidents Can Be Encountered During The Construction Process of Rotary Drilling RIGS

Views: 0     Author: Site Editor     Publish Time: 2025-08-21      Origin: Site

Inquire

facebook sharing button
twitter sharing button
line sharing button
wechat sharing button
linkedin sharing button
pinterest sharing button
whatsapp sharing button
kakao sharing button
snapchat sharing button
telegram sharing button
sharethis sharing button

Rotary drilling RIGS, as commonly used pile foundation construction equipment in construction projects, although they have many advantages such as high efficiency and convenience, may also encounter various accidents during the construction process. Understanding these common accidents can help take preventive measures in advance and ensure the smooth progress of construction.

1


1. Pile center offset: If the pile center shifts during construction, it may be due to incorrect pile position marking or inaccurate positioning of the drilling rig. Once such a situation occurs, it is necessary to reposition precisely and adjust the drilling rig to ensure that the center of the pile meets the design requirements.


2. Pile hole inclination: Pile hole inclination will cause the pile body to tilt, which will affect the construction quality and safety. Poor geological conditions or deviation in the alignment of the drilling rig may both cause the pile hole to tilt. At this point, corrective measures should be taken, such as improving the alignment accuracy of drilling RIGS and strengthening geological exploration.


3. Hole blockage: Insufficient specific gravity of the mud or impurities mixed in the mud may both cause hole blockage. In the face of clogged holes, they can be unblocked by increasing the specific gravity of the mud and clearing mud debris, etc.


4. Drill bit drop: Factors such as unstable connection of the drill bit and complex geological conditions may lead to drill bit drop accidents. After the occurrence, the drill bit needs to be reconnected or replaced, and geological exploration work should be strengthened at the same time.


5. Mechanical failure: During operation, rotary drilling RIGS may encounter mechanical issues such as engine failure and hydraulic system failure. Once a malfunction occurs, it should be promptly investigated and maintained to ensure that the machinery returns to normal operation.


6. Overturning of the drilling rig: Excessive force operation by the operator, uneven construction site, raising the large arm while walking, and unstable foundation can all easily cause the drilling rig to overturn. Therefore, before construction, the site must be leveled and compacted. When walking, the large arm must be lowered back first, and the operation process should be smooth.


During the construction process of rotary drilling RIGS, all kinds of accidents may have an impact on the project progress, quality and personnel safety. The construction team needs to enhance equipment inspection and maintenance, improve the skills and safety awareness of operators, and formulate response plans in advance to reduce the probability of accidents and ensure the smooth progress of construction.


Anhui Yingxie Foundation Engineering Co., Ltd. is a leading exporter of construction machinery in China.

QUICK LINKS

PRODUCT CATEGORY

CONTACT US

 +86-15558187303
 +8615558187303
 1072987052
 1217, Building 3, next to Ji Vienna Hotel, Sanba Street, Yongqiao District, Suzhou City, Anhui Province
Leave a Message
CONTACT US
Copyright  2024 Anhui Yingxie Foundation Engineering Co., Ltd. All Rights Reserved. | Sitemap | Privacy Policy