The construction efficiency of rotary drilling RIGS directly affects the progress and cost of the project. Mastering scientific operation and management tips can enhance work efficiency while ensuring quality. The following are practical methods to improve efficiency.
1. Detailed preliminary investigation: Before construction, conduct a thorough investigation of the geological conditions to clarify the soil layer structure and hardness. Based on this, select the appropriate drill bit model to reduce the frequency of drill changes during the drilling process and avoid ineffective operation time.
2. Equipment status prediction: Before starting work every day, inspect key components such as drill pipes and hydraulic systems, and replace worn parts in advance to ensure that the equipment is in the best operating condition and reduce the probability of mid-process failure and shutdown.
3. Optimization of drilling parameters: Adjust the drilling speed and pressure according to different soil layers. For soft soil layers, the speed can be appropriately increased, while for hard rock layers, the rhythm needs to be controlled and the pressure increased to achieve precise and efficient drilling.
4. Tight process connection: The auxiliary processes such as hole cleaning, steel cage lowering, and concrete pouring are reasonably arranged and seamlessly connected with the drilling operation, reducing the idle waiting time of equipment and enhancing the overall construction continuity.
5. Scientific fuel management: During the hot summer, prevent the fuel tank level from being too low to avoid overheating of the fuel pump. In winter, preheat the fuel system in advance to ensure complete fuel combustion and reduce efficiency losses caused by fuel supply issues.
6. Operator training: Regularly organize skills training to familiarize operators with equipment performance and emergency handling procedures, enhance their operational proficiency and ability to deal with complex situations, and reduce time waste caused by human operational errors.
To enhance the construction efficiency of rotary drilling RIGS, efforts should be made in multiple aspects such as early preparation, equipment maintenance, parameter regulation, and process coordination. Through scientific management and precise operation, not only can the construction period be shortened, but also energy consumption and failure risks can be reduced, providing a solid guarantee for the efficient advancement of the project.