You are here: Home » News » Article » Special Working Condition Operation Guide for Rotary Drilling Tools During Winter Construction

Special Working Condition Operation Guide for Rotary Drilling Tools During Winter Construction

Views: 0     Author: Site Editor     Publish Time: 2025-05-22      Origin: Site

Inquire

facebook sharing button
twitter sharing button
line sharing button
wechat sharing button
linkedin sharing button
pinterest sharing button
whatsapp sharing button
kakao sharing button
snapchat sharing button
telegram sharing button
sharethis sharing button

The low-temperature environment in winter poses many challenges to the construction of rotary drilling tools. It is crucial to master the key points of operation under special working conditions. The following six guidelines will help you work safely and efficiently in the severe cold.

1


1. Preheating of the equipment is indispensable: Before starting the rotary drilling rig, run the engine at low speed for 10 to 15 minutes to allow the engine oil to fully lubricate all components and prevent mechanical damage caused by cold start. Meanwhile, preheat the hydraulic system to ensure smooth flow of hydraulic oil.


2. Check the anti-freezing measures: Carefully inspect the concentration of the antifreeze to ensure it can withstand the local minimum temperature. In addition, insulation covers should be installed on parts such as water tanks and oil tanks to prevent the liquid from freezing and affecting the operation of the equipment.


3. There are certain considerations when choosing drill bits: In winter, the soil freezes and hardens, so drill bits with strong wear resistance and sharp drill teeth should be selected. Adjust the type of drill bit in a timely manner according to the thickness and hardness of the frozen soil to improve the drilling efficiency.


4. Control the drilling speed: Permafrost has high resistance. Do not blindly increase the drilling speed. Drilling should be carried out slowly and at a constant speed to avoid distortion of the drill pipe and accelerated wear of the drill bit due to excessive load.


5. Timely clean the drilling tools: After each drilling operation is completed, promptly remove the soil and ice on the drill bit to prevent freezing and accumulation, which may affect the next operation. Pay attention to safety when cleaning to avoid frostbite.


6. Proper maintenance during shutdown: After the operation is completed, park the drilling rig in a dry and sheltered place. Drain the water from the water tank, apply anti-freezing grease to the key parts of the equipment, and carry out comprehensive maintenance work.


The construction conditions in winter are harsh. However, as long as the above operation guidelines are strictly followed, equipment maintenance and construction management are well done, the special working conditions of rotary drilling tools can be effectively dealt with, ensuring construction safety and progress.


Anhui Yingxie Foundation Engineering Co., Ltd. is a leading exporter of construction machinery in China.

QUICK LINKS

PRODUCT CATEGORY

CONTACT US

 +86-15558187303
 +8615558187303
 1072987052
 1217, Building 3, next to Ji Vienna Hotel, Sanba Street, Yongqiao District, Suzhou City, Anhui Province
Leave a Message
CONTACT US
Copyright  2024 Anhui Yingxie Foundation Engineering Co., Ltd. All Rights Reserved. | Sitemap | Privacy Policy