You are here: Home » News » Article » How To Optimize Costs During The Operation of Rotary Drilling RIGS

How To Optimize Costs During The Operation of Rotary Drilling RIGS

Views: 0     Author: Site Editor     Publish Time: 2025-08-01      Origin: Site

Inquire

facebook sharing button
twitter sharing button
line sharing button
wechat sharing button
linkedin sharing button
pinterest sharing button
whatsapp sharing button
kakao sharing button
snapchat sharing button
telegram sharing button
sharethis sharing button

In the construction of rotary drilling RIGS, cost control is the key to improving the efficiency of the project. From equipment scheduling to consumable management, the optimization of each link can effectively reduce costs, achieve efficient resource utilization, and make construction more economical.

2


1. Reasonably plan the construction process: Conduct geological surveys in advance, formulate targeted drilling sequences, and reduce the idle running and back-and-forth movement time of equipment. By optimizing the connection of processes, the efficiency of daily operations can be enhanced and the energy consumption per unit time can be reduced.


2. Precisely control the usage of consumables: Select appropriate drill bits based on the hardness of the formation to avoid excessive wear; Strictly control the slurry ratio, recycle qualified slurry, and reduce the waste of materials such as bentonite.


3. Scientifically arrange equipment maintenance: Regularly inspect the hydraulic system and power components, and promptly replace vulnerable parts to prevent major shutdowns caused by minor malfunctions. Preventive maintenance can reduce the cost of sudden repairs and extend the service life of equipment.


4. Optimize personnel allocation management: Clarify the responsibilities of each position to avoid idle human resources; Strengthen skills training to enhance the drilling accuracy and equipment control ability of operators, and reduce the rework costs caused by operational errors.


5. Flexibly choose equipment leasing methods: For short-term projects, give priority to leasing equipment to avoid long-term idleness. Adjust the number of leased units according to the construction intensity to achieve a precise match between equipment resources and project requirements.


6. Strengthen on-site safety control: Standardize operation procedures, set up safety warning signs, and prevent casualties and equipment damage caused by safety accidents. Safety without accidents is the most direct cost savings.


Cost optimization for rotary drilling rig construction is a systematic project that requires coordinated efforts from multiple aspects such as processes, consumables, equipment, and personnel. Through scientific management and meticulous operation, not only can the quality and progress of the project be guaranteed, but also unnecessary expenses can be reduced to the greatest extent, laying a solid foundation for the improvement of project benefits.


Anhui Yingxie Foundation Engineering Co., Ltd. is a leading exporter of construction machinery in China.

QUICK LINKS

PRODUCT CATEGORY

CONTACT US

 +86-15558187303
 +8615558187303
 1072987052
 1217, Building 3, next to Ji Vienna Hotel, Sanba Street, Yongqiao District, Suzhou City, Anhui Province
Leave a Message
CONTACT US
Copyright  2024 Anhui Yingxie Foundation Engineering Co., Ltd. All Rights Reserved. | Sitemap | Privacy Policy