You are here: Home » News » Article » How Does The Rotary Drilling Rig Perform in Different Seasons

How Does The Rotary Drilling Rig Perform in Different Seasons

Views: 0     Author: Site Editor     Publish Time: 2025-07-22      Origin: Site

Inquire

facebook sharing button
twitter sharing button
line sharing button
wechat sharing button
linkedin sharing button
pinterest sharing button
whatsapp sharing button
kakao sharing button
snapchat sharing button
telegram sharing button
sharethis sharing button

The working performance of rotary drilling RIGS is affected by seasonal factors such as temperature, precipitation and soil conditions. Through targeted adjustments, stable working capabilities can be maintained in different seasons.

3


1. Spring: After the soil thaws, the humidity is moderate, the drilling resistance of the drilling rig is relatively small, and the hole-forming efficiency is relatively high. However, it is necessary to pay attention to dealing with spring dust and do a good job in dust removal and protection of equipment.


2. Summer: High temperatures may cause the hydraulic system of the equipment to heat up, and it is necessary to enhance heat dissipation maintenance. Heavy rain can easily make the soil muddy. It is necessary to reinforce the site in advance to prevent the fuselage from sinking.


3. Autumn: The climate is dry and cool, and the soil condition is stable. It is an ideal season for rotary drilling rig operations, where both drilling efficiency and equipment stability can be maintained at a relatively good level.


4. Winter: Low temperatures can affect the fluidity of hydraulic oil, so the equipment needs to be preheated in advance. When the hardness of frozen soil is high, the drilling resistance increases. The drill bit and drilling parameters can be appropriately adjusted.


5. Rainy season (concentrated precipitation period) : A sudden increase in soil moisture content can easily lead to hole collapse, and it is necessary to optimize the slurry ratio to reinforce the hole wall. At the same time, it is necessary to prevent moisture in the equipment circuits to avoid short circuits.


6. Dry season (with no precipitation for a long time) : The surface soil layer is hard, and the drilling rig needs to select drill bits suitable for hard soil layers. It is also necessary to pay attention to the control of dust during operation and meet environmental protection requirements.


In conclusion, although the performance of rotary drilling RIGS in different seasons is affected by environmental factors, by predicting the characteristics of each season in advance, adjusting the equipment status and operation parameters, they can effectively adapt to various seasonal conditions and ensure the efficiency and quality of construction.


Anhui Yingxie Foundation Engineering Co., Ltd. is a leading exporter of construction machinery in China.

QUICK LINKS

PRODUCT CATEGORY

CONTACT US

 +86-15558187303
 +8615558187303
 1072987052
 1217, Building 3, next to Ji Vienna Hotel, Sanba Street, Yongqiao District, Suzhou City, Anhui Province
Leave a Message
CONTACT US
Copyright  2024 Anhui Yingxie Foundation Engineering Co., Ltd. All Rights Reserved. | Sitemap | Privacy Policy