How Can Rotary Drilling RIGS Improve The Vertical Accuracy of Pile Driving?

Views: 0     Author: Site Editor     Publish Time: 2025-08-18      Origin: Site

Inquire

facebook sharing button
twitter sharing button
line sharing button
wechat sharing button
linkedin sharing button
pinterest sharing button
whatsapp sharing button
kakao sharing button
snapchat sharing button
telegram sharing button
sharethis sharing button

The vertical accuracy of pile driving by rotary drilling RIGS directly affects the load-bearing capacity of pile foundations and the stability of the project. Excessive deviation may cause structural safety hazards. The following six key measures can effectively enhance the vertical accuracy of pile driving.

3


1. Site pretreatment: Before construction, level the site and compact the foundation to prevent the drilling rig from tilting due to ground settlement. If necessary, lay steel plates to enhance the bearing capacity of the foundation.


2. Equipment calibration and commissioning: Before starting up, check the verticality of the drill mast. Calibrate it with a level and an electronic inclinometer system to ensure that the drill pipe is initially perpendicular to the ground.


3. Precise positioning of pile positions: Use a total station or GPS to locate the pile positions, mark the center points and set up auxiliary reference lines to reduce visual errors during alignment.


4. Slow start control: During the initial drilling, reduce the speed and maintain a low torque operation. After the drill pipe has stabilized in the formation, gradually increase the speed to avoid deviation caused by impact.


5. Real-time monitoring and adjustment: During the drilling process, the inclinometer built into the drill mast is used for real-time monitoring. If any deviation is detected, the machine is stopped immediately and corrected by adjusting the position of the drilling rig or the Angle of the drill mast.


6. Stratum adaptability operation: When encountering strata with uneven hardness and softness, control the drilling rhythm. If necessary, adopt a staged drilling method to prevent the drill pipe from shifting due to uneven force.


To improve the vertical accuracy of pile driving by rotary drilling RIGS, it is necessary to take into account the preparatory work in advance, equipment commissioning and dynamic operation. Only by strictly implementing the site treatment, precise positioning and real-time monitoring procedures, and adjusting the operation parameters in combination with the characteristics of different strata, can the vertical accuracy of the pile foundation meet the engineering standards and lay a solid foundation for subsequent construction.


Anhui Yingxie Foundation Engineering Co., Ltd. is a leading exporter of construction machinery in China.

QUICK LINKS

PRODUCT CATEGORY

CONTACT US

 +86-15558187303
 +8615558187303
 1072987052
 1217, Building 3, next to Ji Vienna Hotel, Sanba Street, Yongqiao District, Suzhou City, Anhui Province
Leave a Message
CONTACT US
Copyright  2024 Anhui Yingxie Foundation Engineering Co., Ltd. All Rights Reserved. | Sitemap | Privacy Policy